ISC Engineering updates QMS to ISO 9001:2008 compliance

Pomona, CA.-January 6, 2009—ISC Engineering has made a corporate decision to update to ISO 9001-:2008 compliance. The company has enlisted the services of Keith Norlander, K & S Enterprises to assist in this effort. Keith has many years of experience as a QMS specialist and will play an active role in ISC Engineering’s quality management system.

ISC’s plans to move to certification by year end.

I With over 100 years of combined management experience, dating back to the late 70’s, ISC’s in depth experience in the molded cable assembly industry is probably second to none. They are prepared to provide standard and custom designs. Flexibility and rapid response make their service unique.

According to Steve Burk, co-founder and president of ISC, “The most common problem facing the overmolding community is tying together the front end of a new product design to the back-end production. So often, the assembly works, the mold is correct, and the part looks ok, but the part does not work.” ISC has addressed this issue by providing vertically integrated design and development processes, from concept through initial production stages, providing turnkey tooling and product designs that work.

Mr. Burk serves as President of ISC Engineering and has been involved in the interconnect and cable assembly industry since 1971. He has written numerous articles on cable assembly and molded interconnect products and is regarded as an expert in the area of molded cable assembly technology.